How we work
From survey to switch-on
One team for the survey, paperwork, installation and service.
Process
Four steps to solar
Site survey
Roof, shade, wiring and past bills checked on site.
Quote & design
System size, layout and a line-by-line written quote.
Paperwork
Help with net-meter and scheme applications.
Install & handover
Installation, testing and a walk-through of the system.
On installation day
Done safely, done neatly.
Our installers fix the mounting structure, lay cables in conduit, mount the inverter where you can see it and earth the whole system. Before we leave we test it with you and explain the display.
- Earthing and lightning arrester as standard
- DC and AC protection boxes
- Monitoring app set up if your inverter has one
- Most home systems installed in one to two days
Warranty papers
Panel and inverter warranties are as given by the makers and handed to you.
Cleaning visits
Optional yearly plans for panel cleaning and checks.
Health checks
We check output, wiring and earthing on service visits.
WhatsApp help
Send a photo of the inverter display and we advise.